A part-completed residential building on the Kharar and New Chandigarh corridor, with an RCC frame standing against finished towers behind it
Construction Tips13 min readBy RS Design Associates

Property Valuation in Kharar and New Chandigarh: Approval Status, Under-Construction Flats and What Lenders Check

Why a valuation on the Kharar and New Chandigarh belt turns on colony approval and construction stage — licensed colonies, PAPRA, and part-built flats.

Kharar and New Chandigarh are not established markets being re-valued. They are a corridor still being built, and that changes what a valuation on this belt actually turns on.

In a settled Mohali sector, a valuer's hardest question is usually whether the house matches its sanctioned plan. Here, two different questions come first: is the colony approved, and is the building finished. Either one can stop a loan file regardless of how clean your own paperwork looks.

Why This Belt Is a Different Valuation Problem

The stretch running from Kharar through Sunny Enclave and out towards Mullanpur has grown faster than its approvals have settled. Licensed colonies sit alongside unlicensed ones on the same road. Towers at full occupancy stand next to towers at plinth level. Land that was agricultural within living memory now carries flats.

For a valuer this means two checks happen before any measuring. What is the approval status of the land this property sits on, and what stage has construction actually reached. In an established sector both of those are usually settled facts. Here neither can be assumed.

Everything else in the process — the panel requirement, the site visit, the report — works the way it does anywhere else in the tricity.

Approval Status: The Question That Comes First

A plot's title and its colony's approval are two different things, and buyers on this belt routinely conflate them. You can hold a registered sale deed in your own name for a plot in a colony that was never licensed. Your title may be perfectly sound. The colony's status is a separate matter, and it is the one a lender tends to ask about.

Licensed colonies. GMADA publishes a district-wise list of licensed colonies, including colonies in Tehsil Kharar, and marks those that do not require an NOC for registry. This list is public and it is specific. If a seller or agent tells you a colony is approved, ask for the licence number and check it yourself rather than taking the assurance.

Unapproved colonies. Under the Punjab Apartment and Property Regulation Act, authorities are restrained from registering a sale deed for a plot in an unauthorised colony without an NOC. The legal position around registrations made without one has been the subject of litigation, and that uncertainty is itself something a lender weighs.

The amendment that is widely misread. A 2024 amendment to PAPRA allowed certain smaller plots bought before a cut-off date to obtain basic civic amenities — water and power connections. It did not regularise those plots or their colonies. This distinction matters enormously in practice, because a buyer sees electricity and a water supply and reasonably concludes the plot must be in order. It does not follow. A connected plot in an unlicensed colony is still a plot in an unlicensed colony as far as a lending decision goes.

Under-Construction Property: Valuing What Exists

Much of the stock on this corridor is sold before it is finished, and a valuation on a part-built property works differently from one on a completed home.

The governing principle is simple: a valuer certifies what is physically present on the date of inspection. Not what the brochure specifies, not what the builder has committed to, not what the sample flat demonstrates. If the structure is at frame stage with no flooring, plaster or fittings, that is what the report records.

In practice this means the report normally notes the stage of construction reached and assesses the property on that basis. Lenders generally disburse against construction stages rather than in one payment, which is why the valuation may be revisited as work progresses rather than being a single event at the start.

Three things follow from this that buyers often do not expect:

The gap between agreement value and assessed value can be wide, particularly early in a project, because one reflects a finished property and the other reflects a partly built one.

Delays in construction affect the lending timetable, not just the handover date, because subsequent disbursement may depend on stages being reached and verified.

The specification actually installed is what counts later. Where a finished flat differs from the agreement — a different flooring grade, a balcony enclosed, a layout altered — the valuer records what is there.

The Completion Certificate Question

On recently developed parts of this belt the completion or occupation certificate is frequently still pending, and its absence is one of the most common things a lender queries.

A valuer's job here is to record the position accurately: whether the certificate exists, and whether what is standing corresponds to what was approved. What happens next is the lender's decision, and lenders vary considerably. Some discount the property. Some defer until the certificate is issued. Some decline the security entirely.

Because the response is lender-specific rather than standard, the practical advice is to establish the certificate's status early — at the stage you are choosing a lender, not at the stage you are waiting for sanction.

What Changes, and What Does Not, Across the Belt

Established Mohali sectorKharar / New Chandigarh belt
First question askedDoes the building match the sanctioned plan?Is the colony approved, and is it finished?
Typical construction stageCompleted, often occupied for yearsFrequently part-built or recently completed
Completion certificateUsually issued long agoOften pending
Approval status of landSettledVaries property to property on the same road
Panel requirementLender-specific empanelmentIdentical — no difference
Valuation methodLand and building, or comparable salesSame methods, applied to a different fact pattern

The right-hand column is why a report on this corridor can take longer to clear, even when the valuation itself is straightforward.

Which Authority Holds Your Record

Both Kharar and New Chandigarh fall within the Greater Mohali Area Development Authority region. Mullanpur, since renamed New Chandigarh, was master-planned under GMADA, which appointed external consultants to prepare the township plan. Kharar's master plan is published separately on GMADA's site.

Civic functions, however, may sit with a local municipal body rather than with the development authority, and the division is not uniform across the belt. Rather than assume, confirm which office holds the approval record and the tax record for your specific property. On a corridor where boundaries have shifted as development has spread, this is worth five minutes of checking.

How the Process Runs

  1. Confirm the valuer is empanelled with your specific lender. Empanelment is lender-by-lender; a valuer accepted by one bank is not automatically accepted by another.
  2. Establish the colony's approval status before anything else, using the licence number and GMADA's list.
  3. Assemble the documents, including the builder-buyer agreement for anything under construction.
  4. Check whether a completion or occupation certificate exists, and if not, what its expected timeline is.
  5. Site visit, at which the valuer measures, photographs and records the construction stage reached.
  6. Report, stating value as on the inspection date, with the approval position and construction stage noted.
  7. Submission to the lender, which decides how to treat any approval gap or incomplete construction.

Documents to Have Ready

  • Title document — sale deed, or allotment letter and conveyance deed
  • Approved layout plan or sanctioned building plan
  • Colony licence or NOC evidence — the belt-specific one
  • Builder-buyer agreement with payment and construction schedule, for under-construction property
  • Completion or occupation certificate where issued
  • Latest property tax receipt
  • Identity proof
  • Possession letter, for a flat

The two in bold are the ones most often missing from a file here, and the two most likely to hold it up.

Preparing for the Visit

Someone who can provide access should be present — the valuer needs to see every part of the property, including terrace, parking and setbacks. For an under-construction property, access to the actual unit matters rather than a sample flat, and if the site is an active construction zone, arrange entry with the builder in advance. A locked unit or a refused site entry usually means a second visit and a delayed report.

Across the Tricity

The method does not change as you move across the region, but the question that decides the file does. In Mohali it is usually deviation from the sanctioned plan on a completed property. In Zirakpur the process runs through GMADA or local municipal approval. In Panchkula and Chandigarh the authorities are HSVP and the Estate Office, each with leasehold and freehold distinctions of their own.

On the Kharar and New Chandigarh belt, it is approval status and construction stage.

What holds everywhere is the panel requirement — how to confirm a valuer is empanelled with your bank explains how to check before you instruct anyone. And where no lender is involved at all, valuation for family settlement, court and capital gains covers what changes.

RS Design Associates in Kharar and New Chandigarh

We are qualified valuers empanelled with a range of banks and NBFCs, and we carry out land and building, residential, commercial and industrial valuations across Kharar, New Chandigarh, Mohali, Zirakpur, Chandigarh and Panchkula. Full details of scope and lender coverage are on our property valuation service page.

Because we work as architects and interior designers alongside valuation, we read a sanctioned plan and an as-built property the same way on either side of the work. On a corridor where much of the stock is part-finished, that distinction between what was approved and what is standing is frequently the whole question.

Request a valuation · See our valuation services

Frequently Asked Questions

Can you get a home loan on a plot in an unapproved colony in Kharar?

It depends entirely on the lender, and many treat an unapproved colony as unacceptable security regardless of the plot's own paperwork. The colony's approval status is a separate question from whether your sale deed is in your name. Before you commit money, ask your lender in writing whether it lends in that specific colony, and ask the seller for the PAPRA licence number so you can check it against GMADA's published list of licensed colonies.

Does the 2024 PAPRA amendment make an unapproved plot legal?

No, and this is the most common misunderstanding on this belt. The 2024 amendment allowed certain small plots bought before a cut-off date to obtain basic civic amenities such as water and power connections. Obtaining a water connection is not the same as the colony being regularised or licensed. A plot can have electricity running to it and still sit in a colony a lender will not lend against, so do not read a utility connection as proof of approval.

How is an under-construction flat valued differently from a completed one?

A valuer can only certify what exists on the date of inspection. For a part-built property the report normally records the stage of construction reached and assesses value accordingly, rather than assuming the finished specification in the brochure. Lenders typically release funds against stages rather than in a single payment, so the valuation may be revisited as work progresses. The builder's promised completion specification is not what gets valued on the day.

Which authority governs property in New Chandigarh and Kharar?

Both fall within the Greater Mohali Area Development Authority region, and Mullanpur, now known as New Chandigarh, was master-planned under GMADA. Kharar has its own master plan published separately by GMADA. Civic functions may sit with a local municipal body rather than the development authority, and the division is not uniform across the belt, so confirm which office holds the record for your specific property rather than assuming.

What documents are needed for a valuation in Kharar or New Chandigarh?

The title document, the approved layout or building plan, the latest property tax receipt and identity proof form the base set. On this belt two more matter unusually: evidence of the colony's approval or licence, and for anything part-built, the builder-buyer agreement with the agreed payment and construction schedule. Where a completion or occupation certificate exists, include it, as its absence is frequently what a lender queries.

Does a missing completion certificate affect the valuation?

It can affect what a lender does with the report more than the valuation figure itself. The valuer records whether the certificate exists. Where it does not, the property may be treated as not fully compliant, and lenders differ widely in how they respond — some discount, some defer until the certificate is issued, some decline. On recently developed stretches of this corridor the certificate is often still pending, so check its status early rather than at sanction stage.

Is a Kharar valuation report different from a Mohali one?

The method is the same and the panel requirement is identical. What differs is where the risk sits. In established Mohali sectors the usual question is deviation from a sanctioned plan on a completed house. On the Kharar and New Chandigarh belt the more common questions are whether the colony is approved at all and whether the construction is finished, both of which are answered before the measuring starts.

Related reading: Property Valuation in Mohali: Plots, Flats and the Papers That Decide Your Report · Property Valuation in Zirakpur: A Simple 2026 Guide · Property Valuation in Panchkula & Chandigarh: HSVP Plots and Sector Houses · Bank Empanelled Valuers: How to Find One Your Lender Will Accept · Property Valuation for Family Settlement, Court and Capital Gains · Property Valuation Report: What Is Inside It and How to Read Yours

Classical luxury villa elevation designed by RS Design Associates

Let's Design Your
Dream Space

Start Your Architectural Journey Today